
Oil tank holes finished up.
|

Lots of metal removed.
|

Engine mount welded in.
|

The whole car.
|

Four cylinder mounts removed.
|

Four cylinder mounts removed.
|

New engine shelf welded in.
|

New engine shelf welded in.
|

New trunk lid pivots welded in.
|

New trunk lid pivots welded in.
|

Trunk lid shock mounts welded in.
|

Crack in the longitudinal.
|

Engman stiffening kit welded in.
|

Engman stiffening kit welded in.
|

Engman stiffening kit welded in.
|

Work completed.
|

Work completed.
|

Trans case tapped for linkage stud.
|

KEP Stage 2 pressure plate
|

Engine dressed and airbox flipped.
|

Boxster caliper modified to fit.
|

Custom aluminum intake tube.
|

Lower valve covers clearanced for 914.
|

Lower valve covers trimmed to fit 914.
|

Throttle linkage installed.
|

Welded up extra holes in tin.
|

Welded up extra holes in tin.
|

Mounted coil on fan housing.
|

Wevo transmission mounts installed.
|

Welded holes from dealer installed AC.
|

Welded drain tube holes.
|

Installed pedal cluster.
|

Installed Rennshifter.
|

Test fitting 914/6 dash.
|

Custom upper steering bearing.
|

911 steering column grafted in.
|

3.2 DME mounted under dash.
|

Battery tray welded in with Odyssey battery.
|

Rain tray holes welded shut.
|

AC hose routing holes welded.
|

AC hole repair.
|

Fuel pump and filter mounted on steering rack.
|

Fuel filter to fuel lines.
|

PMB Performance 914/6 GT oil lines.
|

Wiring in 911 ignition connector.
|

Sealed connector between ECU and engine.
|

Connector detail.
|

Engine side of connector.
|

Dash installation mostly complete.
|

16inch collapsible spare
|

Setrab oil cooler
|

Oil cooler mockup
|

Oil cooler mockup
|

SPAL Fan mockup
|

Fiberglass cooler ducts in progress.
|

Fiberglass cooler ducts in progress.
|

Oil cooler shroud installed.
|